Resource Work Variances
Contents
[
Hide
Show
]Work variance is the difference between the estimated work (the baseline) and actual work performed.
Handling Variances
The WorkVariance property exposed by the Resource class handles variance in work:
- WorkVariance: a project resource’s difference from the baseline work (double).
Microsoft Project View of Resource Work Variance
To see the resource work variance in Microsoft Project:
- On the Resource Sheet, go to the Insert menu and select Column.
- Add the Variance column.
Getting Resource Work Variance in Aspose.Tasks
The following code example demonstrated how to get resource work variance using Aspose.Tasks.
1// Read the input Project file
2System::SharedPtr<Project> project = System::MakeObject<Project>(dataDir + u"WorkVariance.mpp");
3Key<System::SharedPtr<Resource>, AsnKey> asnRsc = Asn::Resource();
4
5{
6 auto ra_enumerator = (project->get_ResourceAssignments())->GetEnumerator();
7 decltype(ra_enumerator->get_Current()) ra;
8 while (ra_enumerator->MoveNext() && (ra = ra_enumerator->get_Current(), true))
9 {
10 System::SharedPtr<Resource> rsc;
11
12 // C# preprocessor directive: #if !__cplusplus
13
14
15 // C# preprocessor directive: #endif
16
17 rsc = ra->Get(asnRsc);
18
19 double d = rsc->Get<double>(Rsc::WorkVariance());
20
21 System::Console::WriteLine(d);
22 }
23}